Base - a wooden subfloor. Prior to laying parquet check horizontal base, the lack of fluctuation and the slack between the individual boards, boards of moisture foundation, as well as temperature and humidity in the room. Small irregularities plank base eliminates redoubt, after sinking head nails and removing debris. Quality redoubt depends on the speed and smoothness of movement planing machine. Redoubt are two workers: parquet layer 4-6-th bit is driving, and parquet layer 2-3rd level moisturizes and sweep the floor, removes the shavings. Next, make a plan laying parquet. Snake should lay out so that the gaps between the boards of the base did not coincide with an end edge parquet. Otherwise, nails, slaughtered in the end, fall into the gap and securing the flooring will be weakened. After that, the wooden base veiled layer of cardstock, vellum or paper. Pull cord for lighthouse Christmas tree, which is placed in the middle of the room along its long axis. To secure the flooring planks base construction nails 40 mm long and a diameter of 1,6-1,8 mm. Two workers are laid flooring: parquet layer 2-3rd level picks up right and left strips and lay them under the hand of parquet 4-6-th bit in the direction of its motion. When laying the planks must first blow to the butt implant the opposite end, and then a blow to the lateral edge of the comb drive in a groove adjacent slats. A nail hammered into the groove by three strokes: the first (easy) baits him, the second (strong) are driving up the groove and the third (with doboynika) utaplivayut hat to failure in the groove. Lines discourage friezes on the outer rows, and it cut strips circular saw (Fig. 20). In addition to widespread pattern "in tree" parquet layer must be able to lay parquet squares lines (Fig. 21), deployed on a square (Fig. 22), as well as the complicated patterns (Fig. 23).
No comments:
Post a Comment