Friday, July 15, 2011

Installing an exterior door

The doorway is covered by a jumper from the top, transferring the load from the overlying structures on the piers. The size of the aperture should be somewhat larger than the door frame. It is desirable that between the frame and the wall had a gap width of not less than 2 cm, which can be used for laying insulation material. The door frame is a frame of sticks with folds that reinforce steel plates or with plastic plugs. For doors with heavy cloths should be applied anchors immure. To the doorframe with threshold in the floor you have two fixtures. If the door leaf width exceeds 1250 mm, an additional box fastened in the middle of the upper horizontal bar. On each side of its pins are fixed, and above the threshold, and screws. At fixing enclose thin strips of wood to the wall and box has not been void and she stood up straight. Under the heads of nails and screws make the counterbores (deepening doth make zenkelem - drill-lance, triangular spatula - for waterboarding the heads of nails, bolts, screws). Then these places shpaklyuyut. When installing the door frames to co-observe the following order of work: Cleaning of the opening in the wall. Install the box into the opening. Horizontal placement and nailing the door. Vertical mounting box by fastening loops and nailing her top and bottom. Attachment of the leaf and verification of fit (if the blade touches the bottom when you open the bars of the box, it lifts or pare down the bottom). Check the density of the porch door of the castle. Mounting of the box, where is embedded locking, two nails and a secondary verification of fit cloth to the box. Check the ease of the leaf when opening and closing. Mounting the box on all sides. Nailing architraves. Waterboarding the heads of nails zashpaklevyvanie heads of nails and screws. Doors are normally attached at three points in height to the vertical bar box. The attachment points have possible at a comfortable height for work. For standard height doors extreme point of attachment is usually removed about 30 cm from the top bar of the box and at 25 cm from the threshold. Door frames are fixed to the wall with steel inserts installed in the wall in the process of laying, or after their construction. Box Reconcile and wedge, and then connect them with mortgage-piece set in the brickwork. If you use the steel lining, the first to attach to the box, but after installing the boxes in the doorway, the other end plates are attached to the wall with nails or dowels. In two or three places on the height of the box arrange a small hole through which is pumped into the gap cement. To prevent the dish of the vertical bars of the box inside the opening at injection and solidification of the solution to a temporary raskreplyayut special spacer or regular board. Linen exterior doors hung on hinges in the box with no pull-out rods to spring hinges that allow the opening of door panels to either side, or mounted on thrust. To ensure the rapid evacuation of all the doors in the path of people should be open to traffic outside.

No comments:

Post a Comment